| |
| |
New Projects of Tangra Unit |
|
| |
|
|
| |
|
| |
Tangra Unit deals mainly in signaling items viz. different types of Relays Point M/C and Project work for Signaling System. |
|
|
|
| |
From the inception, to cope with the Railway’s decision to modernize and to switch over to new technology WSF has been continuously diversifying its activities to newer fields of manufacture and commercial venture to achieve the breakthrough by all round development planning. |
| |
|
|
| |
The rationalization of railway traffic and improvement of transport services required modern technology in many areas of railway operations. In regard to train protection a comprehensive range of equipment, systems and services for all types of main line mass transit system are required in the area of :
a) Continuous automatic train control system
b) Solid state interlocking system
c) Multisection digital axle counter
d) Audio frequency and high voltage impulse track circuit
|
|
 |
Control Panel |
|
|
|
|
AS WSF, Kolkata have the required infrastructure and vast experience in manufacturing of railway brakes and signaling equipments, the emphasis is to explore the possibility of being the associate of any appropriate company and working on mutual co-operation basis on the above lines. |
|
|
|
 |
Integrated Power System |
|
|
|
| |
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|